The work includes mobilization, demobilization, shoring and bracing, traffic control and the procurement and installation of approximately 80 LF of 12” PVC water main and associated fittings and connections by open-cut method, relocation of an existing fire hydrant and construction of a new hydrant lateral, and abandonment of the existing fire hydrant lateral.
Work is located in Soquel and Aptos, CA
Engineer's Estimate: $144,700.00